Onsite power · Aeroderivative turbines · Plant acquisitions

Onsite gas turbine power
for data centers.

Nuerogrid sources and brokers proven, used natural-gas turbines and gensets — especially GE LM2500 and LM6000 packages — so hyperscale and AI data centers and developers can get dispatchable, behind-the-meter (BTM) power. Project timing depends on equipment availability, fuel supply, permitting and site requirements.

LM2500 / LM2500+Industrial or marine · SAC or DLE
LM6000PC · PF · PF+ · PG · core or packaged
Complete plantsSimple-cycle and combined-cycle
The problem

Compute is ready. The grid isn’t.

New data-center load is arriving faster than utilities can study, build and interconnect it. Waiting on transmission can push a campus out by years — and new-build turbine slots carry their own long lead times.

Used aeroderivative units already exist in the field: fast-starting, gas-fired, proven in peaking and industrial service. Finding the right one, verifying it, and getting it under agreement is where Nuerogrid works.

What we do

Three ways we help.

01

Data-center onsite power

Behind-the-meter, dispatchable natural-gas generation for hyperscale and AI campuses — primary, bridge or hybrid with grid supply.

Learn more →

02

Equipment brokerage

Sourcing LM2500 and LM6000 packages, cores and gensets from title holders and authorized representatives, with seller quotes under NDA.

Learn more →

03

Plant acquisitions

Complete simple-cycle and combined-cycle plants built around aeroderivative machines — including units that need refurbishment.

Learn more →

How we work

Direct, documented, confidential.

Every opportunity runs on paper: NDAs up front, clear agency or commission terms, and quotes that come from the party that can actually sell.

Our process

  • NDA before equipment details, locations or pricing change hands
  • Title holders and authorized seller representatives only — no broker chains
  • Written agency or commission agreements, agreed before introductions
  • Seller quotes and documentation passed through intact

Need dispatchable power on a data-center timeline?

Tell BJ what you need — megawatts, site, schedule, fuel — and we’ll start the search under NDA.